Monday, September 11, 2006

09/10/2006 Project Updates, New Stucco Installed

Hi everyone, we have been busy wrapping up the project remodel at the building. Contractors continue to amaze me as they tell me one time and never show. Money always seems to be the motivator, pay right away and they come right away. We got the stucco installed on the outside of the building to cover up the foam insulation and the electric is in. The heating and cooling system has gone in as well and the bathroom is ready for paint and fixtures. A lot of the project should get wrapped up this week, assuming everyone sticks to the schedule. I have to pickup interior doors and drop ceiling today at Home Depot. Our outdoor lighted sign is up and the place is starting to come together.

Paint should go on the walls this week after they are textured tomorrow. We are hoping to open up the store at the end of the month.

I need to get some more pictures taken to show the progress of the remodel so I can get those online for everyone.

I just got an offer on my fourplex. We are working out the details now and we'll see what transpires. hopefully, we can come to an agreement. Once that sells, I will be looking to do a 1031 into a larger unit.

0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home